Scope · limits · disclosure

What this is, what it is not, and what we withhold

The project has had almost no publicity so far, and this release is deliberately partial. We would rather say so plainly than let you discover the gaps.

Definitions

Five things it is regularly mistaken for.

Disclosure

Staging the opening, rather than staging a retreat.

We would rather not put the most load-bearing material into the open while the project is still this quiet. Here is exactly where the line currently sits.

Published in full

The three-level taxonomy. Bilingual names and levels for every capability. The asset index with upstream sources. The dependency network's structure — nodes, domains, degrees, topic tags, 61,476 edges. The 126-query retrieval golden set. The adjudicated duplicate ledger. Every number we report, plus the script that regenerates them. Nine topics reproduced completely, with their diagrams and research ledgers.

Withheld for now

Full capability descriptions in bulk — the fields carrying inputs, outputs, constraints and performance envelopes. These are the substance of the artifact, and what would be worth copying wholesale. You can read them in full for the nine case-study topics, which is enough to judge whether the structure is real.

The intention

Open it completely. The value we are building is the compilation pipeline and the standard, not a moat around a name list — and a knowledge layer nobody can inspect is not infrastructure. We would rather stage the opening than stage a retreat.

Ask for what is missing

If you want access to something specific that is not here — for research, for a benchmark, for an integration — write to wangyuqi11and11@163.com. We are far more likely to say yes than to say no.

Honest status

What we have not established.

Design intent

What changes, if it works.

Stated as intent — not as a measured outcome.

Route survey
Read dozens of papers over several days candidate routes with alternatives, in minutes.
Module selection
Search GitHub and find out the hard way every known implementation, with its attribution.
Orchestration
Hand-wire modules and debug the interfaces ordered from the dependency graph, adaptation flagged.
Reuse
Each project reinvents the artifact accumulates; every task strengthens it.
Onboarding
Oral tradition and a long ramp the graph is the map.